Chair
Shop Production Time
16 minutes
Simoleons/minute (Based on Above Production Time)
Description
For sitting down.
Chair is the first item unlocked in the Furniture Store . The Furniture Store is unlocked at Level 10, the fourth commercial building to be unlocked.
Prices [ ]
Total Time to Produce Chair [ ]
Chair can be produced in 30.2 minutes in 3 stages without using the Global Trade HQ or a Speed-Up Token. Based on this production time, the simoleons/minute is 9.93. (High-tech Factories and 3-star shops were used for these calculations. )
Stage 1 - 3 minutes [ ]
Two Factories
Produce Metal (3) - 1 minute
Produce Wood (3) - 3 minutes
Stage 2 - 11.2 minutes [ ]
Stage 3 - 16 minutes [ ]
Shop Production Time | Simoleons per min. [ ]
Materials Required [ ]
Used In [ ]
Item Used In
Location
Quantity Required
Production Time
Level Available
Nothing
Related Contest of Mayors Tasks [ ]
Item
Points per Item
Amount of Items
Points
Time
Produce & Collect Chair
120
5-18
600-2160
?