Couch is the fifth and final item unlocked in the Furniture Store. The Furniture Store is unlocked at Level 10, the fourth commercial building to be unlocked.
Couch can be produced in 684 minutes(11 hours, 24 minutes) in 3 stages without using the Global Trade HQ or a Speed-Up Token. Based on this production time, the simoleons/minute is 2.64. (High-tech Factories and 3-star shops were used for these calculations.)